A New Learning Resource Centre for Bishop Vesey’s Grammar School
Brand new learning spaces are planned for Bishop Vesey’s Grammar School as we address critical challenges to our estate in the run-up our 500th anniversary in 2027. These spaces will enable us to bring our school environment up to the same level of excellence as the education we have been delivering for centuries.
Central to our plans is a new Learning Resource Centre, set over three floors at the front of the School. It will provide flexible dedicated Sixth Form study space enriched with IT facilities; a new whole-school dining room and library plus new classrooms and space adaptable to study, social activities and out of hours community use.
This new facility will free up other areas of the school for refurbishment, the first of which will deliver a state-of-the-art Computer Suite in the main School, consisting of two classrooms equipped to the highest specification.
We aim to have these new facilities open in September 2025.